menu
ammarcoux
Refinish my basement by the end of ... Star this Commitment

ammarcoux commits to:
Refinishing my basement by the end of March. This would include floors, walls, electrical work and plumbing.
No more reports due
Details
My Commitment Journal
alido
alido
December 23, 2018, 1:29 PM
Amazing photo
alido
alido
December 23, 2018, 1:29 PM
Your neighbors must be thinking your are a mad scientist building some crazy underground lab.
ammarcoux
ammarcoux
December 19, 2018, 2:46 PM
And so the drilling for my geothermal heat pump finally begins.
ammarcoux
ammarcoux
November 26, 2018, 2:21 AM
A lot has happened in last week. Put an anti back flow valve in my emergency drain in the basement but it the drain seems to be blocked. I put up the wall for the my electrical subpanel my electrician came over and did all the wiring. The next day the geothermal guys came over to install the new geothermal heatpump. Upon removal of the old furnace I found the concrete under it wall in poor condition. I patched it with some 3 minute patch just in time for the new heat pump install. The new heat pump is now installed but running on the auxiliary electric heater until the drilling can be done for the geothermal. To be continued...
  • Apr 6, 2018
  • Apr 6, 2018
  • Apr 6, 2018
  • Apr 6, 2018
  • Apr 7, 2018
  • Apr 7, 2018
  • Apr 7, 2018
  • Apr 8, 2018
  • Apr 12, 2018
  • Apr 12, 2018
  • Apr 12, 2018
  • Apr 16, 2018
Displaying 1-1 of 1 result.
December 1 to March 31
Not Successful
No report submitted
.
+
Server IP 10.0.0.173
Portal Id 0
User Id 0
Unix Timestamp 1731706811
Current Timezone GMT
Server encoding: utf-8
Assets folder: https://static.stickk.com/yii-assets/dcbc9e4e
Payment Type PRODUCTION
Your feedback has been sent. Thank you!
This website uses cookies to ensure you get the best experience on our website. Read our Privacy Policy
Loading...